When you pick up your exhibitor documents and accreditations at the Expo Accreditation, you will also receive access permits allowing you to drive your vehicles to your booth. You can enter the festival grounds via one of the access roads on Viale Rovereto. There will also be signs on the main road indicating the corresponding booth numbers, so you can find the correct access road directly using your booth number.

IMPORTANT: 
It is not permitted to drill holes in the ground to secure the stand. In case of violation, the repair costs of damages will be charged to the responsible stand after the event. Therefore, please only secure your stand with appropriate weights.

Please move your vehicles to the designated parking immediately after unloading.

Due to the local conditions of the Expo site in Riva del Garda, access for all trucks and lorries of 12 tons and more is only permitted before the official set-up on Tuesday, 28.04.2026 between 2:00 P.M. - 7:00 P.M.

We would also like to point out that the dismantling of the stands on Sunday, 03.05.2026 may only begin after the end of the festival from 4:00 P.M. and is possible until 12:00 P.M. For safety reasons, driving on the Expo grounds with all motor vehicles is only permitted from 5:00 P.M. on Sunday.

Setup Times
- Tuesday, April 28: 2:00 P.M. – 7:00 P.M. (only trucks ≥12t)
- Wednesday, April 29: 09:00 A.M. – 6:00 P.M.
- Thursday, April 30: 09:00 A.M. – 6:00 P.M.

Dismantling Times​
- Sunday, May 3: 4:00 P.M. – 12:00 P.M. (Access by motor vehicle to the ​EXPO area is only permitted for security reasons from 5:00 P.M.)

On the following pages you will find pictures of the individual expo areas so that you can assess the different floor structures and include them in your stand planning.

VIA RAINER MARIA RILKE
Asphalt: A1-A22
asset_image

asset_image

Asphalt: B1-B4
asset_image



PARCO VILLINO CAMPI
Grass/Gravel: B5
asset_image

Grass: B6-B9
asset_image

asset_image

Concrete (Basketball):
B10-B23
asset_image

Gras
B24-B25
asset_image



CAMPO SPORTIVO BENACENSE

Tartan:
C1-C2
C9-C13

Grass & Tartan (Attention: between the grass and tartan is a 3-5cm high stone edge):
C3
C7-C8
D1-D31

Grass:
C4-C6
C14-C16

asset_image


VILLINO CAMP NORD
Cobblestones: E1-E14
asset_image

asset_image

Thank you

Thank you for your registration!

Something went wrong

Retry

Thank you

Your request has been sent successfully and we will reply as soon as possible. A copy of the data you have provided us with has been sent to your email address.